Framing and Wiring
Construction Phase II: Framing, Electrical Wiring, Indoor Septic Lines, and Exterior Insulation. Photos Sept - Oct 2007.
-
Lumber Arrives
-
Framing the First Wall
-
Framing Windows and Doors
-
Raising the Walls
-
In Place to Raise the Last Wall
-
Lifting the Wall
-
Framed Walls Supported by 2x4s
-
Framing Out the Roof
-
View through the Rafters
-
Roof Spacers and OSB Sheathing
-
Installing OSB on the Roof
-
Greenhouse Fully Enclosed
-
Interior Walls Framed Out
-
Clerestory Windows Installed
-
Framing for Interior Walls Complete
-
Foil Backed Rigid Foam for Insulation
-
South Side Windows and Foil Insulation
-
Wiring for Electricity
-
Boxes Installed for Receptacles & Switches
-
Wiring the Circuit Breaker Box
-
Wiring for Interior Lights
-
Electrical Wiring in the Walls and Ceiling
-
Light Switches
-
Close Up of Bathroom Switch
-
Wiring for Exterior Outlets
-
ABS Pipe for Interior Waste Lines and Vents
-
Waste Line for Sink Drain
-
ABS Vent Pipes for Waste Lines